During casing operations for 9-5/8” deployment, the objective was to isolate the water sensitive Wasia and Biyadh shales and close off the lost circulation zones across the Shu’aiba formation.
Customer Challenge
Key Challenges of the Various Zone Formations:
Safaniya Formation: Caving’s & Water Influx
Lower Aruma: Shales
Wasia & Biyadh (Water Sensitive): Bit Balling
Shuaiba: Loss Circulation Zones
VES Performance
Previous Casing Shoe Depth (13-3/8”): 4225’ 9-5/8” Total Depth: 6780’
Length Drilled conventionally: 1773’ (till 5998’)
Length Drilled by CwD: 782’ (till 6780’) 12-15 BPM
During casing operations for 13-3/8” deployment, the objective was to sut off the lost circulation in the ARUMA and WASIA formations and prevent the WASIA formation from charging the upper formations / isolate the water sensitive WASIA shales.